I've previously outlined the areas of the City's Snow and Ice Control Procedure that apply to residential roadway snow clearing. The August 2026 Snow and Ice Control Policy and Program Review described the Procedure as follows:

"The Snow and Ice Control (SNIC) Procedure defines how the broader policy is executed."

"Procedure: Tactical execution of the policy using approved resources to achieve target service levels is approved annually by the City Manager."

"[P]rocedures are reviewed regularly and updated to align with industry best practices, other City policies and bylaws, resource changes, changing weather patterns, in response to resident and Council feedback, and to improve the safety, mobility and livability of Edmontonians"

Well, that sounds pretty good. It's hard to argue with the objectives and guiding principles of the governing Policy.

However, a procedure is only as good as the outcomes it provides, and as we saw during the winter of 2025/26, the outcomes were not good.

What the Mayor Said

So according to the Procedure, if there are snowfalls every five or six days, residential roadway snow clearing needs to wait until the snow stops and all of the Priority 1, 2, and 3 roadways are clear.

Or at least that's what the Mayor told us, and presumably that's what the Administration told him, but is that really what the Procedure says? Looking closely at the very first page of the Procedure, Item 1 establishes the clearing sequence:

"Snow Clearing Priority Hierarchy (considering an average snowfall)"

Well, the Mayor described the snowfall of December 2025 as "unprecedented" and "record breaking"; I don't think anybody would have called it merely "average" for Edmonton. Did the Mayor read the Procedure?

Gaps in the Procedure

  • Definition of Average: The first item of the Procedure introduces a heirarchy of snow and ice control, with the caveat that it is "based on average snowfall". Unfortunately, that is its only use of the word "average" - nowhere in the document is the term defined, despite there being a section of the Procedure that defines no less than 31 terms.

  • Heavy Snowfall: The Procedure identifies actions that may be taken in the event of Severe Snowfall ("a snowfall of 30 cm or more within 24 hours or less that threatens access to the mobility network") or Snow Emergency ("an extreme winter storm that causes the closure of a significant portion of the mobility network"). However, it appears to be silent on snowfall events that fall between "average" and "severe" - events such as we experienced in December 2025.

  • Cumulative Snowfall: Similarly, the Procedure is silent on cumulative or continuous snowfall events. It sets no snow accumulation threshold at which snow and ice control efforts would begin to be applied to residential roadways, only stating that the "decision to initiate a residential blading cycle will be made by the City of Edmonton based on several factors including, but not limited to, residential roadway conditions, current and forecasted weather, a minimum snowpack of 5 cm consistently citywide and status of snow clearing on priority 1, 2 and 3 roadways."

  • Freezing Rain: Despite the recent Policy and Program Review stating that the Procedure is "reviewed regularly and updated to align with... changing weather patterns," it is silent on the phenomenon of freezing rain. Freezing rain on deeply rutted, snow covered residential roadways created extremely hazardous conditions in January 2026.

Accountability

The Snow and Ice Control Procedure that was in effect over the winter of 2026/26 had numerous failings, both in what it said to do, and in what it was silent on. If the heirarchy was truly applicable only to "average" snowfall, it should have included instructions on what to do in the case of "non-average" snowfall, including the recurrent events of winter 2025/26.

I view this Procedure as an engineering document, and it was one of the subjects of a Professional Practice complaint that I submitted to APEGA. I am currently waiting on a response to an Access to Information Act request related to the Procedure. It was approved by the City Manager - who is not an engineer - but the document does not identify its author(s). Accountability is required.

Furthermore, the Mayor issued a number of communications in January 2026 that referenced the Procedure, and as noted above, implied that it tied his hands. The heirarchy governed all efforts. A careful read of the Procedure - and recognition that conditions were anything but "average" - should have allowed him to take action instead of hiding behind it. Accountability is required.