ATIA Request #3 - Service Levels
Updated: Oct 31
Background
As discussed in detail in another post, the City's web page describing snow clearing service levels was edited in the fall of 2025. As late as 9 October 2025, it defined the service level for residential snow clearing as "completed within 10 days once a residential blading cycle is initiated". By 29 November, that had been changed to "completed within 14 days once a residential blading cycle is initiated". This edit was in the same time frame as approval (on 15 October 2025) of the City's Snow and Ice Control Procedure, in which the service level was identified as "completed within 240 hours (10 days) once a residential blading cycle is initiated".
My reasons for requesting these documents included:
Finding out who requested these changes;
Seeing any background on why the changes were requested; and
Finding out why the web page did not reflect the actual City Procedure.
Specific Request
My initial submission was acknowledged, after a revision request by me, was:
Preamble: The City maintains a web page entitled “Snow Clearing Service Levels”
During the period between 17 September and 9 October 2025, in the table indicating Snow Clearing Priority Hierarchy, the entry for Local/Residential Roads (Priority 4) - Parking Ban Phase was edited to change “the ban will shift to residential and industrial area roads” to “the ban may shift to residential and industrial area roads”.
During the period between 25 September and 29 November 2025, the entry for Local/Residential Roads (Priority 4) – Service Level was edited to change “completed within 10 days” to “completed within 14 days” [emphasis mine], and the entry for Local/Residential Roads (Priority 4) - Parking Ban Phase was edited to change “Lasts uo [sic] to 10 days” to “Lasts up to 14 days”.
Request:
1. Please provide any documents or communications related to these web site changes, including requests or directives from Mayor, Council, or the Administration.
2. Please provide the precise dates Of these web page changes, audit or activity logs related to the changes, and the names Of any persons responsible for these changes.
3. Please provide previous versions of the City of Edmonton Snow and Ice Control Procedure C409K, including versions C409G, C409H, C4091, C409J
Timeframe: Aug 01, 2025 to Feb 28, 2026
This request was assigned a due date of 21 October 2026.
Delivery
On 21 October 2026, a response was received from the City of Edmonton, and is available here.
Commentary - 25 October 2026
The response to my ATI request comprised 131 pages, including:
29 pages loosely addressing the request (3 pages describing web page edits; copies of Procedures C409K and C409G; copies of Policies C409H, I, and J that integrated elements of Procedure). The C409K document, including duplicates noted below, was an unapproved version.
6 pages of unrequested irrelevant Policy documents.
35 pages of unrequested City Council documents predating the timeframe indicated in the request.
46 pages of duplicate Policy and Procedure documents.
15 blank pages.
A page-by-page breakdown of the response is available in an Excel spreadsheet here. That includes comparisons of duplicate documents prepared using Grok.
The response to my request was largely unresponsive:
The three pages devoted to Items 1 and 2 above indicated that the web page had been edited nine times over the requested timeframe; however, it failed to identify any details related to my specific request and completely ignored two of the three edits identified above.
The response related to Item 3 above largely provided Policy documents, rather than the requested Procedure documents. The only useful part of the entire response was a copy of Procedure C409G; versions C409H, I, and J were absent from the response, and the four copies of Procedure C409K were all undated versions.
As a result of the non-responsive nature of the documents provided, I submitted a Request for Review to the City, outlining the deficiencies in the response. If that is not appropriately addressed, my next step will be to escalate a Request for Review to the Office of the Information and Privacy Commissioner of Alberta.
Update - 28 October 2026
A response to my Request for Review was provided by the City, stating that:
We will reach out to the business area and have them conduct a secondary search. We will provide you with an update on or before November 13, 2026.



Comments